Infrastructure, buildings & materialsCôte d’Ivoire | +225 27 21 74 21 12
Get a quoteFR
Numbers: use a decimal point or comma and spaces for thousands (for example 1 000,5). Enter 0 explicitly when a cost or rate does not apply. Blank fields do not mean zero.

CONSTRUCTION TOOLS

Before the site work,
get the quantities right.

Six free tools to estimate quantities, plan transport, prepare a budget and clarify your enquiry. You control the dimensions and assumptions.

A FIRST QUANTITY ESTIMATE

Concrete volume

For a slab or a rectangular structure.

Free preliminary quantity tools. Results do not replace a detailed quantity survey, engineering design or quotation. Calculator inputs are not stored on the website.

LOGISTICS & BUDGET

Plan the next steps
before the site work.

Your assumptions remain on your device. Export a printable sheet with inputs, calculations and limitations.

PREPARE YOUR ENQUIRY

How many truck trips?

Compare the mass and volume limits of the truck body.

YOUR ESTIMATE

—

Confirm density, permitted payload for the route and usable body volume with the carrier. The estimate is not permission to load a vehicle.

Request a quotation ↗

PREPARE YOUR ENQUIRY

What budget should I allow?

Enter your supplier’s unit price using the same unit as your quantity.

YOUR ESTIMATE

—

No BENEOUA price is prefilled. The entered rate applies to quantity × unit price + transport. Check whether your price already includes tax or transport to avoid double counting. This estimate is not a commercial offer.

Request a quotation ↗