CASE STUDY · BENEOUA TP

Bouaké water supply programme

Heavy grading, access track development and construction equipment mobilisation under separately documented missions.

SECTORRoad & hydraulic works
LOCATIONWater conveyance corridor from Lake Kossou
PERIODSeparate interventions in 2022–2023 and amendment in 2025–2026

THE REQUIREMENT

A defined
scope of work.

Support work on the water pipeline corridor and access tracks for the drinking water supply network.

BENEOUA’S CONTRIBUTION

Heavy grading, access track development and construction equipment mobilisation under separately documented missions.

DOCUMENTED PHASES

February 2022 – September 2023

Heavy grading and access track development.

September – December 2023

Amendment for grading the pipeline corridor.

March 2022 – September 2023

Construction equipment hire.

December 2025 – February 2026

Amendment for grading and treatment of critical points.

Photograph illustrating BENEOUA TP construction activities

Photograph illustrating BENEOUA TP’s trades, without attribution to this specific operation.

EXPERTISE MOBILISED

A practical
project reference.

Platform preparation, site equipment organisation and work along a linear corridor.

BENEOUA TP technical dossier, October 2026, pages 32 and 34. This presentation describes the declared missions. It does not assert additional quantitative results or completion certificates.