San-Pédro water intake bank protection

A dredging and bank protection mission listed in BENEOUA TP’s project references.

SECTORHydraulic works
LOCATIONWater intake at the San-Pédro treatment plant
PERIODJune 2023 – April 2024

THE REQUIREMENT

A defined
scope of work.

Work around the water intake of the treatment plant on the San-Pédro river.

BENEOUA’S CONTRIBUTION

A dredging and bank protection mission listed in BENEOUA TP’s project references.

DOCUMENTED PHASES

June 2023 – April 2024

Dredging and bank protection around the water intake.

Photograph illustrating BENEOUA TP construction activities

Photograph illustrating BENEOUA TP’s trades, without attribution to this specific operation.

EXPERTISE MOBILISED

A practical
project reference.

Works interfacing with a hydraulic site and its water intake surroundings.

BENEOUA TP technical dossier, October 2026, page 32. This presentation describes the declared missions. It does not assert additional quantitative results or completion certificates.